ServiceInstallation and debugging

Installation and debugging

中国人数最多、最专业的甲板设备技术服务团队, 提供现场服务,让服务更便捷、更高效
  • Installation phase Installation phase
    Installation phase
    Test whether the basic performance of the equipment meets the technical specifications and whether the assembly of the equipment meets the standards.
  • Shore test stage Shore test stage
    Shore test stage
    Verify whether the equipment installed on the ship meets the process specifications, whether the equipment joint commissioning performance is stable, and whether the system test parameters meet the standards.
  • Sea trial phase Sea trial phase
    Sea trial phase
    Simulate the operation of scientific research, test the operation of the equipment in the real environment, and further adjust the equipment.
  • Safeguard phase Safeguard phase
    Safeguard phase
    Participate in the shipowner's first scientific research mission to ensure the normal operation of the equipment.